Almost always yes — but not to see whether you like it. The point of a sample is to get one physical unit you can seal, keep, and hold the production run against. A sample you approve and then leave in a drawer buys you nothing. A sample you seal buys you the only real leverage you will have once your money is in the factory.
A listing cannot answer these. One unit in your hand can.
| Type | What it is | Typical timing | What it tells you |
|---|---|---|---|
| Catalogue sample | An existing item sent as-is | Days to about a week | Whether the factory’s standard product is any good. It tells you nothing about your own specification |
| Modified sample | An existing item with changes — colour, logo, packaging | Roughly one to two weeks | Whether the factory can follow instructions, which is the thing you are really testing |
| Custom or OEM sample | Built to your drawings or specification, often needing tooling | Several weeks, and tooling can be most of it | Whether the product can be made at all, at your cost, at your quality |
A fourth case worth knowing: if you send a reference product and ask the factory to match it, that is a counter sample, and it usually costs noticeably more than a catalogue sample because the factory is reverse-engineering rather than pulling from a shelf.
Sample fees are commercial convention, not law, so the arrangement is whatever you agree — in writing.
| Situation | Common practice |
|---|---|
| Catalogue sample | Often free; you pay the courier. Freight paid on delivery is the usual default |
| Custom sample | Charged, because a one-off piece interrupts production. The fee is commonly credited against the first bulk order |
| Large orders | The fee is more likely to be credited in full, or waived above the supplier’s normal minimum quantity |
| Small orders | Often credited, sometimes only partially |
| You never place the order | The fee is generally kept. That is the factory’s compensation for the interrupted run |
| Tooling or moulds | Paid as a separate line item, or spread into the unit price over an agreed quantity |
Two things to settle before you pay rather than after:
On price: a useful rule of thumb is that a sample should not cost many times the unit price you are targeting. If a supplier wants a large fee for a simple item, ask what it covers — sometimes the honest answer is tooling, and sometimes it is a filter to see whether you are serious.
You can reasonably skip a sample when the item is cheap, standard, bought from a shop you have used before, and a wrong unit costs less than the sample freight. That is a real case, and pretending otherwise insults your budget.
You must not skip it when the specification is custom, the supplier is new, the order is large, or the goods carry your own name.
A sample is not enough on its own when the product needs to pass a compliance test, a safety standard, or a destination-market certification. A sample tells you it looks right. Only a test tells you it is legal to sell. For regulated categories, plan for both.
Almost always, but with a specific purpose: not to see whether you like the product, but to obtain one physical unit you can seal and keep as the reference the production run is judged against. You can reasonably skip it for a cheap, standard, catalogue item where a wrong unit costs less than the sample shipping, or when timing absolutely outweighs the risk. You should never skip it for a custom specification, a new supplier, or anything you intend to resell under your own name.
By commercial convention it usually is credited against the first bulk invoice, but the arrangement varies: some suppliers credit it only above a minimum quantity, some only if the order lands within a stated window of a few months, and if you do not proceed the fee is generally kept as compensation for interrupted production. None of this is law. Get the credit term written into the quotation or the order record before you pay, not agreed verbally afterwards.
The golden sample is the approved unit that becomes the quality benchmark for the production run. You keep one, the factory keeps one, and both are signed, dated and photographed so nobody can argue about what was agreed. Without it, an inspector comparing finished goods has no objective reference and a defect becomes a matter of opinion. It is the cheapest leverage you will ever buy on a bulk order.
A stock sample typically ships within days. A modified catalogue sample usually takes one to two weeks. A fully custom sample with tooling can take several weeks, and each round of revisions adds more time on top. Ask for the tooling and revision clock specifically, plan a buffer on whatever figure you are given, and consolidate your corrections into one list per round so you do not pay for the same delay twice.
About to place a bulk order and want it locked down? Send me the product and your specification. I get the sample in hand first, correct it with the factory before tooling, seal the approved unit, and inspect the finished run against that sealed reference — so the thousand units you receive match the one unit you approved.